DB Series · soaker

DB8 Motion Soaker

Motion soaking for retrofit projects — flexible brackets, plug-in wiring and a lower entry cost, with the same 60 %+ water saving.

Photo for reference only. The actual product may vary.
Overview

Practical motion soaking

The DB8 is the value route into motion-controlled soaking. It clamps onto the existing supply pipe, wires in through quick connectors, and wets only the position a cow is standing at — so a retrofit needs neither a new valve rail nor a rewired cabinet.

  • 60 %+ less water than timed soaking — water flows only at occupied positions
  • Flexible bracket and SS316 clamps suit different pipe sizes and materials
  • Plug-and-play quick connectors remove field control wiring
  • Runs standalone, or on the platform through a DB7 or Mini-C Plus
  • 60 %+Less water than timed soaking
  • 1.5–2.1 mStandard spacing options
  • 1.7–1.9 mTypical mounting height on the feedline
  • SS316Clamps, valve and nozzle
Advantages

Why the DB8 is specified

Four reasons it wins the retrofit projects where cost and pipe access come first.

60 % less water

Only the position under a standing cow receives water, so the alley is cooled without running the whole line on a timer.

Flexible retrofit

A stainless or galvanised main bracket with SS316 clamps adapts to the pipe already in the barn.

Fast commissioning

Plug-in connections eliminate field control wiring, which is where retrofit projects usually lose their budget.

Serviceable module

The control module lifts out for maintenance or replacement without disturbing the supply pipe.

Operation

How it works

Detect, soak, stop — repeated position by position along the rail.

  1. 01 Detect Motion sensing identifies that a position at the feed rail is occupied.
  2. 02 Soak Only the detected cow position receives water.
  3. 03 Stop Water stops when the cow leaves the position.
Configuration

Installation and service

Spacing, wiring and the online option.

  1. Spacing options Set the units at 1.5, 1.8 or 2.1 m (5, 6 or 7 ft) along the feedline.
  2. Plug-in wiring Quick connectors remove field control wiring from the project.
  3. Online option A DB7 or Mini-C Plus connects DB8 to the BARNEYE platform.
Key specifications

Key specifications

ParameterSpecification
Operating voltage24 V DC
Power consumptionApprox. 12 W
Flow rate at 25 psiApprox. 3.5 L/min
Standard spacing1.5 m / 5 ft · 1.8 m / 6 ft · 2.1 m / 7 ft
Recommended height1.7–1.9 m
Standalone defaultGroup Precision
Status indicatorsPower, signal, soaking
Main bracketStainless or galvanised
Valve and nozzleSS316, high flow
Expected water savingMore than 60 %
System fit

Normally specified with

The DB8 still needs one controller behind it — a DB7 switches and powers the whole run, however many units are on the rail.

Retrofitting an existing feedline?

Send us the pipe size, the feedline length and a photograph of the rail. We will come back with the unit count, the spacing and what it does to water use.

Ask an engineer
Datasheet and wiring diagram
Mounting and coverage plan
Spares and service intervals